How we install
The Peerless
Standard.
Seven steps behind every Orange County installation, from the first call to the final check. The same care for a single replacement or a fully appointed kitchen, for homeowners and for the contractors, designers and builders we work with.
From first call to final check
Seven steps, every installation.
Step one
The call
Share the brand, model numbers, your Orange County city, timing and photos of the opening. Incomplete details are fine; share what you know.
Step two
The review
We check the opening, utilities, access route and the manufacturer’s requirements before the appointment, so the day is planned, not improvised.
Step three
The site check
Openings built to manufacturer specs, gas, water, power and drainage ready, panels on site for panel-ready units, and a clear path in. We would rather reschedule than force a half-ready opening.
Step four
The placement
The old unit is disconnected when that is arranged, then the new appliance is moved in carefully and positioned correctly.
Step five
Set, level, connect
The appliance is set, leveled for dependable operation and connected to the utilities the job calls for.
Step six
The final eighth of an inch
Doors, panels and the surrounding cabinetry are checked and aligned for consistent reveals and a composed finish.
Step seven
Final testing
Connections and essential functions are checked before we leave, with old-appliance haul-away on the same visit when it was planned.

Where the steps lead
Built in, not merely delivered.
Custom-paneled Sub-Zero refrigeration and a center wine column, aligned as one architectural wall in Laguna Beach. Consistent reveals and a finish that belongs to the room.
Plan your installation
Let’s get the details right.
Share your appliance models, Orange County city and photos of the space. We’ll review every detail and confirm the next steps with you.